Year | Work Done | Cost |
2004 | Home purchased | 126,300 |
2004 | Electrical system upgrade | 3600 |
2004 | Slate roof repairs | 3300 |
2004 | New kitchen installation (labor) | 4100 |
2004 | New kitchen cabinets (Kraftmaid) | 2225 |
2004 | Hardwood floors sanded/refinished | 2000 |
2004 | Kitchen appliances/laundry machines (included in house sale) | 1500 |
2007 | Boiler servicing (replaced back flow preventer and pressure reducing valve) | 450 |
2008 | Shored-up brick footings to second-floor back porch | 1000 |
2010 | Bathroom tile repair and floor replacement (labor) | 1000 |
2010 | Tile/supplies for bathroom floor | 500 |
2010 | Installed foam insulation in attic floor | 2000 |
2011 | Replaced/installed hot water heater | 750 |
2011 | Replaced/installed boiler expansion tank | 750 |
2011 | New front storm/screen door | 600 |
2012 | Tuck-pointed chimney/replaced limestone cap | 1500 |
2012 | Tuck-point repairs on home exterior | 1000 |
2012 | Slate/front porch roof repairs | 2500 |
2012 | Exterior carpentry repairs/replace limestone window shelf | 1500 |
2012 | Exterior painting (labor) | 1000 |
2012 | Exterior painting (materials - Sherwin Williams) | 650 |
2012 | New front and back porches (labor and materials) | 2500 |
2012 | New front steps and sidewalk | 1000 |
2012 | New back storm door | 400 |
2012 | New basement entrance security door | 400 |
2012 | Basement electrical work | 500 |
2014 | Replaced bathroom sink (labor and materials) | 500 |
Total | 163,525 |
Sunday, April 19, 2015
Costs of Repairs/Upgrades since 2004
A prospective buyer asked me for this information, so I thought I'd share it with the world:
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment